Measured — LEON by Modern Tastemaker
The LEON scorecard.
LEON is our sound engine: it studies a real recording and rebuilds the sound from measurement. This page is its report card — a 19-gate battery run against one real cello recording, with every threshold, every measured value, and every failure printed. 13 of 19 gates pass. 6 fail. Both numbers are the story.
Scope — read this first. Every figure on this page is render-specific and dated: one reference recording (a cello, arco — bowed — C2, mf, from the University of Iowa recordings), two candidate builds, measured October 21–22, 2026. This is a fit result — LEON fitting a recording it was tuned on. It is not a held-out test, not a transfer proof, and not a blind listening test. Those are separate, harder tests; their status is stated at the bottom of this page, and today it is: generalization is not proven. We never claim a recreation is perceptually identical to its reference — we publish distances against thresholds, and the distance is the whole claim.
The 19 gates
Each gate compares the candidate render against the reference on one measurable property, against a threshold fixed before the run. “First build” and “Rebuild” are two successive candidate renders of the same note, scored by the same battery. The verdict column is the rebuild’s.
| Gate | What it checks | Threshold | First build | Rebuild | Verdict |
|---|---|---|---|---|---|
| M-03 | DC offset | ≤ 0.001 | 0.0007 | 0.0007 | PASS |
| M-04 | Onset offset | ≤ 2.9 | 2.68 | 2.56 | PASS |
| M-05 | F0 (pitch) track distance | ≤ 15.0 | 6.87 | 4.60 | PASS |
| M-06 | Peak-envelope shape | 1.0 – 3.0 | 48.59 | 49.77 | FAIL |
| M-07 | Attack time | ≤ 11.0 | 259.41 | 19.95 | FAIL |
| M-08 | Decay landmarks | ≤ 0.81 | 0.18 | 0.63 | PASS |
| M-09 | RMS loudness curve | ≤ 0.5 | 36.71 | 37.43 | FAIL |
| M-10 | Crest / dynamics | ≤ 3.8 | 0.31 | 2.18 | PASS |
| M-11 | LTAS band levels | ≤ 24.0 | 27.57 | 1.83 | PASS |
| M-12 | Spectral shape | ≤ 0.91 | 0.19 | 0.03 | PASS |
| M-13 | Bow-noise floor | ≤ 17.0 | 43.96 | 2.56 | PASS |
| M-14 | Log-mel distance | ≤ 6.4 | 7.07 | 7.46 | FAIL |
| M-15 | Spectral grain | ≤ 0.15 | 0.11 | 0.09 | PASS |
| M-16 | MFCC timbre distance | ≤ 0.037 | 0.0078 | 0.0021 | PASS |
| M-17 | Partial amplitude | ≤ 46.0 | 10.61 | 1.23 | PASS |
| M-19 | HNR (harmonic-to-noise) vs real cello | ref 14.80 | 5.05 | 14.70 | PASS |
| M-20 | Integrated loudness | ≤ 0.3 | 0.11 | 2.48 | FAIL |
| M-21 | True peak / LRA | ≤ 0.3 | 0.35 | 0.36 | FAIL |
| M-25 | RT60 (reverb decay) | ≤ 0.19 | 0.02 | 0.18 | PASS |
Two further legs are tracked alongside the 19, on the same two builds:
- Vibrato legFAIL on both builds — distance 5.00, then 5.32, against a gate of 3.68. Candidate-side vibrato contour fidelity is an unsolved problem, stated as such.
- M-28 legPASS on both builds — the two-region −35 dB statistic reads 3.47, then 1.64, against a threshold of ≤ 7.25. This is the program’s gate of record for spectral distance at low level.
The 6 failures, with their causes
A scorecard that hides its failures is marketing. Ours stay on the page:
- M-06 · M-09Peak-envelope shape and the RMS loudness curve fail on both builds, by wide margins (49.77 vs a 1.0–3.0 window; 37.43 vs ≤ 0.5). Open problems. No candidate has solved them, and no wording on this page softens that.
- M-07Attack time fails as the battery reads it (19.95 vs ≤ 11.0). The cause is measured, not guessed: the same render without its fitted bow-noise layer reads 4.99 — a pass — and the bow noise shifts the battery’s onset read by roughly 15 ms while the attack audio itself is unchanged. We report the FAIL, because the battery is the battery.
- M-14Log-mel distance misses on both builds (7.07, then 7.46, vs ≤ 6.4) — the rebuild moved slightly away on this leg while fixing three others.
- M-20A genuine regression: the first build passed integrated loudness (0.11); the rebuild fails it (2.48). Cause, from the build record: the rebuild’s lower crest factor means an inherited peak-matching step applies +2.86 dB more gain. The peak anchor was deliberately not retuned mid-family — so the fail stands until a later build earns it back.
- M-21True peak / LRA misses narrowly on both builds (0.35, 0.36 vs ≤ 0.3). Narrow is still a miss.
The ruler — how far the program actually is
The 19 gates above are one test of one note. The full program — the “Bar” — is bigger: fit, held-out transfer, blind identifiability, and five instrument families. On October 22, 2026, the Bar was broken into 12 equal chunks and each chunk scored from banked evidence only (quarter-step partial credit; in-flight work earns nothing). That derivation is the ruler of record:
| # | Chunk of the Bar | Completion | Evidence, in one line |
|---|---|---|---|
| 1 | Ruler trust — scorer + ε foundation | 0.75 | Scorer and independent audit done; the per-family ε remainder is expressly still open. |
| 2 | Cello pizz fit — first proof | 1.00 | Keeper render: 15 of 19 gates, M-28 6.937 vs ≤ 7.25 — a pass whose headroom (0.313) is smaller than the measured packaging effect (+0.680), cited with that margin attached. |
| 3 | Cello arco fit gate | 0.75 | At derivation date: head candidate held 5 of 6 fit legs, 13 of 19 gates; one leg failed under both rulers. (Status updated since — see below.) |
| 4 | Held-out transfer leg | 0.00 | The first transfer test ran and failed. No passing transfer verdict exists, so the score is zero however complete the staging is. |
| 5 | Blind identifiability leg | 0.50 | A 180-trial blind package is built and QC-graded — and never fired. No at-chance verdict exists yet. |
| 6 | Drums Bar | 0.25 | Lead kick candidate not cleared (composite 6.264 vs ≤ 5.027; one leg failed outright); pattern blind not run. |
| 7 | Pads Bar | 0.50 | All three mandatory legs held at once on 1 of 2 cells (M-40 0.0622 vs ≤ 0.0814). |
| 8 | Bass Bar | 0.25 | The Bar itself is still a draft; machinery proven in an 81-of-81-pair dress rehearsal; no candidate yet. |
| 9 | FX Bar | 0.25 | Bar an unratified draft; seed corpus still zero files; the measurement legs themselves are built and validated. |
| 10 | Engine packaging / integration | 0.50 | Engine package complete; its smoke re-run reproduces every banked score bit-exactly. Rendering still lives with the lane builders. |
| 11 | Playbook deposit | 0.25 | The cello playbook is ratified and deposited. The other four families have none — 1 of 5. |
| 12 | Library / product content | 0.25 | One of the three named products shippable at derivation date; the Serum bank honestly at 0 of 110 presets through the battery. |
- Full Bar5.25 of 12 chunks = 43.75% ≈ 44% — how far along the program is, partial credit included.
- Cello onlyThe four cello Bar legs (chunks 2, 3, 4, 5): 2.25 of 4 = 56.25% ≈ 56%. An earlier “≈70% cello” figure circulated in our own notes; no scoring of this table reproduces it, and it is retired.
- Binary floorCounted cleared-or-not, only 1 of 12 chunks meets its full criterion: 8.3%. Both figures are true; they answer different questions — “how far along” (44%) vs “how much is fully cleared” (8.3%). We publish both so neither can be quoted without the other’s meaning.
State update — October 25, 2026
Three days after the derivation, the arco fit gate was attacked again (test T-1R, attempt 2). Two things happened, and both are reported:
- Fit gateCLEARED — a new candidate passed the arco fit gate: 12 of 19 battery gates, gated leg 2.487389 against ≤ 2.5, M-28 4.136 against ≤ 7.25. Those numbers belong to that candidate render only; they do not rewrite the table above, which is a different build’s record.
- TransferVOID — not a pass, not a clean fail. The held-out firing was invalid as constructed: 4 of the 6 holdout cells were too short to measure (sustains of 0.494–0.858 s against a 1.0 s minimum), scoring 13 of 19 on the validity floor of 15. The 2 measurable cells were scored and failed (10 of 19 and 8 of 19 gates; distance ratios 1.8897 and 1.7970 against ≤ 1.3×). The one-shot seal is spent. A fresh transfer test is registered and frozen with measurability as a hard gate before any firing.
- The rulerThe percentages above have not been re-derived since October 22. Until a re-derivation lands, 44% / 56% / 8.3% remain the figures of record — with this update printed next to them.
What has not been tested yet
- TransferNo passing held-out verdict exists. Until one does, everything LEON has proven is fit — one recording, fitted well, with 6 published failures.
- Blind A/BThe 180-trial package is built; the at-chance listening test at full grade has never been run. Nobody here claims listeners can’t tell — the test that could say so hasn’t fired.
- Other familiesDrums, pads, bass and FX are partial or draft-grade (see the ruler). Cello is the only family with a cleared fit gate.
- VocalsOn the roadmap, deliberately gated behind a cello transfer proof. Not started as a LEON family, and nothing about vocals is claimed.
Sources, kept in our lab records and available on request: the two scored pair files for the builds above (gate-by-gate JSON), the M-13 excess analysis, the ruler derivation of October 22, 2026, and the program plan of October 25, 2026. This page was compiled October 28, 2026; it is updated when new measurements land — and only then.